These are documents that a construction project planner submits to the project architect and engineer for approval before construction begins. Submittals may include requests for equipment and materials, technical drawings, and instructions for the construction team.
Submittals are documents prepared by contractors that provide detailed information and specifications for materials, equipment, and systems to be used in a construction project. These documents require approval from the architect or engineer before procurement and installation can proceed. Submittals play a crucial role in ensuring that the project meets design intent and compliance with regulations, contributing to the overall quality and success of the construction effort.
Submittals may include samples of flooring materials or detailed specifications for HVAC systems that require approval before procurement.